Net Schedule / TPoint - OrCAD 16.6-2015

Description: 

Some net may need to re-ordered so that the pins are routed in particular way to satisfy electrical constraints or improve routability.  The Net Schedule feature allows these nets to be defined in a specific routing path or pattern.  T-points – also known as Rat T’s - are non-physical logical database objects that you can use to insert a branch and end point along a scheduled net at a point other than at a component pin.

View Resource

Tags

  • 16.6-2015
  • Productivity
  • Routing